EPOXY FLOORINGNSW
Free quote
Seamless light grey epoxy commercial kitchen floor with coved skirting in Dapto

Commercial Kitchen Flooring in Dapto

Servicing Dapto 2530 and the surrounding Illawarra. Seamless non-slip epoxy with sand-filled coving carried up the wall. Hygienic, hoseable and built for a floor that gets cleaned every night.

Build thickness
4–9 mm
Coving height
100–150 mm
Slip rating
To P5 wet
Thermal range
−40 to 120 °C
Commercial Kitchens · Dapto 2530

Why Dapto slabs need the preparation done first

We work across Dapto 2530 and the wider Illawarra most weeks, so a site assessment is usually a two or three day wait rather than a fortnight.

A kitchen floor has to survive hot oil, steam cleaning, dropped pans and a hose at 4am. We lay a heavy-duty non-slip epoxy or urethane system and — the part that matters most — form a sand-filled cove where the floor curves up into the wall.

That curved cove is what makes the floor hygienic. There is no square junction for grease and water to sit in, nowhere for a mop to miss, and nothing for an auditor to write up. We take the cove up 100 to 150 mm and terminate it under the wall sheet or against a stainless capping.

What is included

  • Sand-filled coving formed at every floor-to-wall junction
  • Seamless — no grout lines, no joints to harbour grease
  • Non-slip finish rated for wet and greasy areas
  • Falls to floor wastes checked and corrected
  • Withstands steam cleaning and thermal shock
  • Works staged overnight around service

The specification

Build thickness4–9 mm
Coving height100–150 mm
Slip ratingTo P5 wet
Thermal range−40 to 120 °C
Return to service24–48 hours

How the job runs in Dapto

  1. We come to Dapto, measure the area, moisture-test the slab and photograph anything that needs repair.
  2. You get a written quote within two business days with preparation, repairs and coats itemised separately.
  3. On day one we diamond-grind the surface back and cut out the cracks, with dust extraction running throughout.
  4. The system goes down in coats, each one checked with a wet film gauge before the next.
  5. We hand back a clean floor with the colour, batch numbers and cure times written down for your records.

Questions we get in Illawarra

What is coving and do I need it?

Coving is a curved fillet of sand-filled resin where the floor sweeps up into the wall instead of meeting it at a square corner. In any food handling area you want it — it removes the crevice that grease and water collect in and it is the first thing an auditor looks for.

Can you work around service hours?

Yes. Kitchen work is almost always staged overnight or across a shutdown so you are trading the next day.

Will it handle steam cleaning?

Yes. The urethane systems we use for kitchens tolerate thermal shock from −40 °C to 120 °C, which covers steam cleaning and cold room thresholds.

How soon can you look at my job in Dapto?

Usually within two or three business days. The assessment takes about 45 minutes — we measure up, probe the slab for moisture and photograph any cracks — and the written quote follows within two business days of that.

Nearby

Commercial Kitchens near Dapto

We cover Illawarra and the surrounding areas. Same crew, same preparation standard, no travel loading inside the metro area.

Commercial Kitchens in Dapto — Book Your Free Assessment

Free on-site assessment across Illawarra — Mon–Sat, 6:30am–5pm.