Servicing Marrickville 2204 and the surrounding Inner West. Solid colour epoxy build coats for distribution centres, factories and storage facilities, staged around your operating hours.
Marrickville sits inside our standard service area in Inner West, which means no travel loading on the quote and no minimum job size beyond a single garage.
Warehouse floors fail at the joints and the traffic lanes first. We grind the slab, reinstate the saw cuts properly, repair spalled edges, then lay a solid colour epoxy build coat at 300 to 600 microns with line marking set out to your rack plan.
The work is staged. Most of our commercial jobs run nights and weekends section by section, so racking comes down and goes back up in bays and the site keeps picking through the week.
| Build thickness | 300–600 µm |
|---|---|
| Traffic | Forklift rated |
| Return to service | 24–48 hours |
| Line marking | Included |
| Recoat | Year 7–10 |
Yes. Staged night and weekend works are how most of our warehouse jobs run. We coat in sections, hand back a trafficable floor each morning and move to the next bay.
Grinders run on HEPA-filtered extraction so airborne dust is minimal, though it is never zero. We mask off adjoining areas and racking that stays in place.
Yes, set out to your rack plan — aisles, walkways, bay numbers, hatching and exclusion zones.
Yes. Marrickville 2204 is inside our standard service area in Inner West, along with the surrounding suburbs. There is no travel loading on quotes inside the Sydney metro area, and regional jobs are quoted with a clearly itemised mobilisation allowance.
We cover Inner West and the surrounding areas. Same crew, same preparation standard, no travel loading inside the metro area.
Free on-site assessment across Inner West — Mon–Sat, 6:30am–5pm.