Heavy-duty coatings for plant rooms, workshops and loading docks — built for forklift traffic, dropped steel and chemical spills. Free on-site assessments across Cessnock and the rest of Newcastle & Hunter.
If you are in Cessnock or anywhere else in Newcastle & Hunter, the assessment is free and we will tell you straight if the slab is not worth coating.
Industrial areas need a thicker system than a warehouse aisle. Where there is impact, chemical exposure or wash-down, we build up to a broadcast or screed system rather than a roll-applied coat, and detail the bunding, plinths and dock edges by hand.
We spec to the exposure. A workshop that drops steel needs impact resistance; a plating room needs chemical resistance; a dock needs UV stability and slip resistance at the threshold. They are not the same product and they should not be quoted as if they are.
| Build thickness | 1–9 mm |
|---|---|
| Traffic | Forklift and pallet jack |
| Chemical | System dependent |
| Return to service | 24–72 hours |
| Line marking | Included |
It depends on the chemical, which is why we ask what you handle before quoting. Tell us the exposure and we will spec a system rated for it rather than guessing.
Yes. We cut in by hand around fixed plant, machine bases and pits, and stage the work so production keeps running.
Yes — SWMS, safety data sheets and product data sheets before we mobilise, and the applied thicknesses on completion.
Usually within two or three business days. The assessment takes about 45 minutes — we measure up, probe the slab for moisture and photograph any cracks — and the written quote follows within two business days of that.
We cover Newcastle & Hunter and the surrounding areas. Same crew, same preparation standard, no travel loading inside the metro area.
Free on-site assessment across Newcastle & Hunter — Mon–Sat, 6:30am–5pm.